コンテンツへ移動
Alaska Public Utilities Commission power pooling / central dispatch planning study, docket U-97-140 : final report [and] appendices 資料のプレビュー
閉じる資料のプレビュー
確認中…

Alaska Public Utilities Commission power pooling / central dispatch planning study, docket U-97-140 : final report [and] appendices

著者: Alaska Public Utilities Commission.; Black & Veatch International.
出版: [Anchorage? : Alaska Public Utilities Commission, 1998]
エディション/フォーマット:   書籍 : Document : State or province government publication   コンピューターファイル : English
データベース:WorldCat
概要:
This report analyzes the potential benefits of a power pool with central dispatch among the Railbelt Utilities in Alaska pursuant to the Alaska Public Utilities Commission docket U-97-140. The Power pooling study outlines the current operation of the system, benchmarks 1996 operation, provides expansion plans for a 20 year period, and determines the potential benefits and costs of pooled operation.
評価:

(まだ評価がありません) 0 件のレビュー - 是非あなたから!

件名:
関連情報:

 

オンラインで入手

この資料へのリンク

オフラインで入手

&AllPage.SpinnerRetrieving; この資料の所蔵館を検索中…

詳細

資料の種類: Document, Government publication, State or province government publication, インターネット資料
ドキュメントの種類: 図書, コンピューターファイル, インターネットリソース
すべての著者/寄与者: Alaska Public Utilities Commission.; Black & Veatch International.
OCLC No.: 123030951
注記: "October 1998."
複製に関する注記: Computer printout. [Juneau, Alaska : Alaska State Library, 2007]. 28 cm.
物理形態: 1 v. (various pagings) : maps ; 28 cm.
詳細: This item was harvested from the Alaska Energy Authority web site: http://www.akenergyauthority.org/PDF%20files/uso/PowerPooling.pdf in April 2007 for the Alaska State Publications Program; remote access available via StaticURL.
コンテンツ: Final study --
Appendices A-L.
責任者: [prepared for the Alaska Public Utilities Commission ... by Black & Veatch International, Inc.].

概要:

This report analyzes the potential benefits of a power pool with central dispatch among the Railbelt Utilities in Alaska pursuant to the Alaska Public Utilities Commission docket U-97-140. The Power pooling study outlines the current operation of the system, benchmarks 1996 operation, provides expansion plans for a 20 year period, and determines the potential benefits and costs of pooled operation.

レビュー

ユーザーレビュー
GoodReadsのレビューを取得中…
DOGObooksのレビューを取得中…

タグ

まずはあなたから!
リクエストの確認

あなたは既にこの資料をリクエストしている可能性があります。このリクエストを続行してよろしければ、OK を選択してください。

リンクデータ


<http://www.worldcat.org/oclc/123030951>
library:oclcnum"123030951"
library:placeOfPublication
library:placeOfPublication
rdf:typeschema:MediaObject
rdf:typeschema:Book
rdf:valueUnknown value: sgp
rdf:valueUnknown value: gpb
rdf:valueUnknown value: dct
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:contributor
schema:contributor
schema:datePublished"1998"
schema:description"Final study -- Appendices A-L."
schema:description"This report analyzes the potential benefits of a power pool with central dispatch among the Railbelt Utilities in Alaska pursuant to the Alaska Public Utilities Commission docket U-97-140. The Power pooling study outlines the current operation of the system, benchmarks 1996 operation, provides expansion plans for a 20 year period, and determines the potential benefits and costs of pooled operation."
schema:exampleOfWork<http://worldcat.org/entity/work/id/101965184>
schema:inLanguage"en"
schema:name"Alaska Public Utilities Commission power pooling / central dispatch planning study, docket U-97-140 : final report [and] appendices"
schema:publication
schema:publisher
wdrs:describedby

Content-negotiable representations

ウインドウを閉じる

WorldCatにログインしてください 

アカウントをお持ちではないですか?簡単に 無料アカウントを作成することができます。.