skip to content
Ship work breakdown structure Preview this item
ClosePreview this item
Checking...

Ship work breakdown structure

Author: Navsec.
Publisher: Washington : The Center, 1977.
Edition/Format:   Print book : English
Database:WorldCat
Rating:

based on 1 rating(s) 0 with reviews - Be the first.

 

Find a copy in the library

&AllPage.SpinnerRetrieving; Finding libraries that hold this item...

Details

Document Type: Book
All Authors / Contributors: Navsec.
OCLC Number: 7981825
Notes: Loose-leaf.
NAVSEA 0900-LP-039-9010.
Description: 1 volume : illustrations ; 28 cm
Responsibility: prepared and maintained by the Naval Ship Engineering Center.

Reviews

User-contributed reviews
Retrieving GoodReads reviews...
Retrieving DOGObooks reviews...

Tags

Be the first.
Confirm this request

You may have already requested this item. Please select Ok if you would like to proceed with this request anyway.

Linked Data


Primary Entity

<http://www.worldcat.org/oclc/7981825> # Ship work breakdown structure
    a schema:Book, schema:CreativeWork ;
   library:oclcnum "7981825" ;
   library:placeOfPublication <http://id.loc.gov/vocabulary/countries/dcu> ;
   library:placeOfPublication <http://experiment.worldcat.org/entity/work/data/30400804#Place/washington> ; # Washington
   schema:bookFormat bgn:PrintBook ;
   schema:creator <http://experiment.worldcat.org/entity/work/data/30400804#Person/navsec> ; # Navsec.
   schema:datePublished "1977" ;
   schema:exampleOfWork <http://worldcat.org/entity/work/id/30400804> ;
   schema:inLanguage "en" ;
   schema:name "Ship work breakdown structure"@en ;
   schema:productID "7981825" ;
   schema:publication <http://www.worldcat.org/title/-/oclc/7981825#PublicationEvent/washington_the_center_1977> ;
   schema:publisher <http://experiment.worldcat.org/entity/work/data/30400804#Agent/the_center> ; # The Center
   wdrs:describedby <http://www.worldcat.org/title/-/oclc/7981825> ;
    .


Related Entities


Content-negotiable representations

Close Window

Please sign in to WorldCat 

Don't have an account? You can easily create a free account.