aller au contenu
The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77 Aperçu de cet ouvrage
FermerAperçu de cet ouvrage
Vérifiant…

The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77

Auteur : J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.)
Éditeur : Santa Monica, CA : Rand, 1998.
Édition/format :   Livre électronique : AnglaisVoir toutes les éditions et tous les formats
Base de données :WorldCat
Résumé :
This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77  Lire la suite...
Évaluation :

(pas encore évalué) 0 avec des critiques - Soyez le premier.

Sujets
Plus comme ceci

 

Trouver un exemplaire en ligne

Liens vers cet ouvrage

Trouver un exemplaire dans la bibliothèque

&AllPage.SpinnerRetrieving; Recherche de bibliothèques qui possèdent cet ouvrage...

Détails

Genre/forme : Electronic books
Format – détails additionnels : Print version:
U.S. aircraft carrier industrial base.
Santa Monica, CA : Rand, 1998
(DLC) 98006126
(OCoLC)38566261
Type d’ouvrage : Ressource Internet
Format : Ressource Internet, Fichier informatique
Tous les auteurs / collaborateurs : J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.)
ISBN : 0585377383 9780585377384 083302597X 9780833025975
Numéro OCLC : 48138950
Notes : "Prepared for the United States Navy, Office of the Secretary of Defense."
"National Defense Research Institute."
"MR-948-NAVY/OSD"--Page 4 of cover.
Description : 1 online resource (xxxi, 170 pages) : illustrations (some color)
Autres titres : United States aircraft carrier industrial base
Responsabilité : John Birkler [and others].

Résumé :

This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R & D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R & D funding level for these ships. Appendixes to the report provide supporting data.

Critiques

Critiques d’utilisateurs
Récupération des critiques de GoodReads...
Récuperation des critiques DOGObooks…

Tags

Soyez le premier.
Confirmez cette demande

Vous avez peut-être déjà demandé cet ouvrage. Veuillez sélectionner OK si vous voulez poursuivre avec cette demande quand même.

Données liées


<http://www.worldcat.org/oclc/48138950>
library:oclcnum"48138950"
library:placeOfPublication
library:placeOfPublication
rdf:typeschema:MediaObject
rdf:typeschema:Book
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:alternateName"United States aircraft carrier industrial base"@en
schema:bookFormatschema:EBook
schema:contributor
schema:contributor
<http://viaf.org/viaf/139691881>
rdf:typeschema:Organization
schema:name"National Defense Research Institute (U.S.)"
schema:contributor
<http://viaf.org/viaf/262565556>
rdf:typeschema:Organization
schema:name"United States. Department of Defense. Office of the Secretary of Defense."
schema:contributor
schema:datePublished"1998"
schema:description"This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R & D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R & D funding level for these ships. Appendixes to the report provide supporting data."@en
schema:exampleOfWork<http://worldcat.org/entity/work/id/800055694>
schema:genre"Electronic books"@en
schema:inLanguage"en"
schema:name"The U.S. aircraft carrier industrial base force structure, cost, schedule, and technology issues for CVN 77"@en
schema:publication
schema:publisher
schema:url<http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=47936>
schema:url<http://www.rand.org/publications/MR/MR948/>
schema:workExample
schema:workExample
wdrs:describedby

Content-negotiable representations

Fermer la fenêtre

Veuillez vous identifier dans WorldCat 

Vous n’avez pas de compte? Vous pouvez facilement créer un compte gratuit.