컨텐츠로 이동
The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77 해당 항목을 미리보기
닫기해당 항목을 미리보기
확인중입니다…

The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77

저자: J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.); et al
출판사: Santa Monica, CA : Rand, 1998.
판/형식:   전자도서 : 영어모든 판과 형식 보기
데이터베이스:WorldCat
요약:
This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77  더 읽기…
평가:

(아무런 평가가 없습니다.) 0 리뷰와 함께 - 첫번째로 올려주세요.

주제
다음과 같습니다:

 

온라인으로 문서 찾기

이 항목에 대한 링크

도서관에서 사본 찾기

&AllPage.SpinnerRetrieving; 해당항목을 보유하고 있는 도서관을 찾는 중

상세정보

장르/형태: Electronic books
추가적인 물리적 형식: Print version:
U.S. aircraft carrier industrial base.
Santa Monica, CA : Rand, 1998
(DLC) 98006126
(OCoLC)38566261
자료 유형: 인터넷 자료
문서 형식: 인터넷 자원, 컴퓨터 파일
모든 저자 / 참여자: J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.); et al
ISBN: 0585377383 9780585377384 083302597X 9780833025975
OCLC 번호: 48138950
메모: "Prepared for the United States Navy, Office of the Secretary of Defense."
"National Defense Research Institute."
"MR-948-NAVY/OSD"--P. [4] of cover.
설명: 1 online resource (xxxi, 170 p.) : ill. (some col.)
다른 제목 United States aircraft carrier industrial base
책임: John Birkler ... [et al.].

초록:

This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R&D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R&D funding level for these ships. Appendixes to the report provide supporting data.

리뷰

사용자-기여 리뷰
GoodReads 리뷰 가져오는 중…
DOGObooks 리뷰를 가지고 오는 중…

태그

첫번째 되기
요청하신 것을 확인하기

이 항목을 이미 요청하셨을 수도 있습니다. 만약 이 요청을 계속해서 진행하시려면 Ok을 선택하세요.

링크된 데이터


<http://www.worldcat.org/oclc/48138950>
library:oclcnum"48138950"
library:placeOfPublication
library:placeOfPublication
owl:sameAs<info:oclcnum/48138950>
rdf:typeschema:Book
rdfs:seeAlso
schema:about
schema:about
schema:about
rdf:typeschema:Intangible
schema:name"TECHNOLOGY & ENGINEERING--Marine & Naval."
schema:about
schema:about
rdf:typeschema:Intangible
schema:name"Nuclear aircraft carriers--United States--Design and construction."
schema:sameAs<http://id.loc.gov/authorities/subjects/sh85092942>
schema:about
schema:about
schema:about
schema:about
<http://id.worldcat.org/fast/1035168>
rdf:typeschema:Intangible
schema:name"Navy-yards and naval stations--Economic aspects."
schema:about
schema:about
rdf:typeschema:Intangible
schema:name"TECHNOLOGY & ENGINEERING--Military Science."
schema:about
rdf:typeschema:Intangible
schema:name"Navy-yards and naval stations--Economic aspects--United States."
schema:sameAs<http://id.loc.gov/authorities/subjects/sh85090447>
schema:about
<http://id.worldcat.org/fast/1039880>
rdf:typeschema:Intangible
schema:name"Nuclear aircraft carriers--Design and construction."
schema:bookFormatschema:EBook
schema:contributor
schema:contributor
schema:contributor
schema:contributor
schema:datePublished"1998"
schema:description"This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R&D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R&D funding level for these ships. Appendixes to the report provide supporting data."
schema:exampleOfWork<http://worldcat.org/entity/work/id/800055694>
schema:inLanguage"en"
schema:name"The U.S. aircraft carrier industrial base force structure, cost, schedule, and technology issues for CVN 77"
schema:numberOfPages"170"
schema:publisher
schema:url<http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=47936>
schema:url<http://www.rand.org/publications/MR/MR948/>
schema:workExample
schema:workExample
schema:workExample
schema:workExample

Content-negotiable representations

윈도우 닫기

WorldCat에 로그인 하십시오 

계정이 없으세요? 아주 간단한 절차를 통하여 무료 계정을 만드실 수 있습니다.