doorgaan naar inhoud
The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77 Voorbeeldweergave van dit item
SluitenVoorbeeldweergave van dit item
Bezig met controle...

The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77

Auteur: J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.)
Uitgever: Santa Monica, CA : Rand, 1998.
Editie/Formaat:   eBoek : EngelsAlle edities en materiaalsoorten bekijken.
Database:WorldCat
Samenvatting:
This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77  Meer lezen...
Beoordeling:

(nog niet beoordeeld) 0 met beoordelingen - U bent de eerste

Onderwerpen
Meer in deze trant

 

Zoeken naar een online exemplaar

Links naar dit item

Zoeken naar een in de bibliotheek beschikbaar exemplaar

&AllPage.SpinnerRetrieving; Bibliotheken met dit item worden gezocht…

Details

Genre/Vorm: Electronic books
Aanvullende fysieke materiaalsoort: Print version:
U.S. aircraft carrier industrial base.
Santa Monica, CA : Rand, 1998
(DLC) 98006126
(OCoLC)38566261
Genre: Internetbron
Soort document: Internetbron, Computerbestand
Alle auteurs / medewerkers: J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.)
ISBN: 0585377383 9780585377384 083302597X 9780833025975
OCLC-nummer: 48138950
Opmerkingen: "Prepared for the United States Navy, Office of the Secretary of Defense."
"National Defense Research Institute."
"MR-948-NAVY/OSD"--Page 4 of cover.
Beschrijving: 1 online resource (xxxi, 170 pages) : illustrations (some color)
Andere titels: United States aircraft carrier industrial base
Verantwoordelijkheid: John Birkler [and others].

Fragment:

This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R & D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R & D funding level for these ships. Appendixes to the report provide supporting data.

Beoordelingen

Beoordelingen door gebruikers
Beoordelingen van GoodReads worden opgehaald...
Bezig met opvragen DOGObooks-reviews...

Tags

U bent de eerste.
Bevestig deze aanvraag

Misschien heeft u dit item reeds aangevraagd. Selecteer a.u.b. Ok als u toch wilt doorgaan met deze aanvraag.

Gekoppelde data


<http://www.worldcat.org/oclc/48138950>
library:oclcnum"48138950"
library:placeOfPublication
library:placeOfPublication
rdf:typeschema:MediaObject
rdf:typeschema:Book
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:alternateName"United States aircraft carrier industrial base"@en
schema:bookFormatschema:EBook
schema:contributor
schema:contributor
<http://viaf.org/viaf/139691881>
rdf:typeschema:Organization
schema:name"National Defense Research Institute (U.S.)"
schema:contributor
<http://viaf.org/viaf/262565556>
rdf:typeschema:Organization
schema:name"United States. Department of Defense. Office of the Secretary of Defense."
schema:contributor
schema:datePublished"1998"
schema:description"This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R & D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R & D funding level for these ships. Appendixes to the report provide supporting data."@en
schema:exampleOfWork<http://worldcat.org/entity/work/id/800055694>
schema:genre"Electronic books"@en
schema:inLanguage"en"
schema:name"The U.S. aircraft carrier industrial base force structure, cost, schedule, and technology issues for CVN 77"@en
schema:publication
schema:publisher
schema:url<http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=47936>
schema:url<http://www.rand.org/publications/MR/MR948/>
schema:workExample
schema:workExample
wdrs:describedby

Content-negotiable representations

Venster sluiten

Meld u aan bij WorldCat 

Heeft u geen account? U kunt eenvoudig een nieuwe gratis account aanmaken.