The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77

著者: J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.); et al
出版商: Santa Monica, CA : Rand, 1998.
版本/格式:   电子图书 : 英语查看所有的版本和格式
数据库:WorldCat
提要:
This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77  再读一些...
评估:

(尚未评估) 0 附有评论 - 争取成为第一个。

主题
更多类似这样的

 

在线查找

与资料的链接

在图书馆查找

&AllPage.SpinnerRetrieving; 正在查找有这资料的图书馆...

详细书目

类型/形式: Electronic books
附加的形体格式: Print version:
U.S. aircraft carrier industrial base.
Santa Monica, CA : Rand, 1998
(DLC) 98006126
(OCoLC)38566261
材料类型: 互联网资源
文件类型: 互联网资源, 计算机文档
所有的著者/提供者: J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.); et al
ISBN: 0585377383 9780585377384 083302597X 9780833025975
OCLC号码: 48138950
注意: "Prepared for the United States Navy, Office of the Secretary of Defense."
"National Defense Research Institute."
"MR-948-NAVY/OSD"--P. [4] of cover.
描述: 1 online resource (xxxi, 170 p.) : ill. (some col.)
其他题名: United States aircraft carrier industrial base
责任: John Birkler ... [et al.].

摘要:

This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R&D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R&D funding level for these ships. Appendixes to the report provide supporting data.

评论

用户提供的评论
正在获取GoodReads评论...
正在检索DOGObooks的评论

标签

争取是第一个!
确认申请

你可能已经申请过这份资料。如果还是想申请,请选确认。

链接数据


<http://www.worldcat.org/oclc/48138950>
library:oclcnum"48138950"
library:placeOfPublication
library:placeOfPublication
owl:sameAs<info:oclcnum/48138950>
rdf:typeschema:Book
schema:about
schema:about
schema:about
schema:about
schema:about
<http://id.worldcat.org/fast/1039880>
rdf:typeschema:Intangible
schema:name"Nuclear aircraft carriers--Design and construction"@en
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
<http://id.worldcat.org/fast/1035168>
rdf:typeschema:Intangible
schema:name"Navy-yards and naval stations--Economic aspects"@en
schema:about
schema:bookFormatschema:EBook
schema:contributor
<http://viaf.org/viaf/139691881>
rdf:typeschema:Organization
schema:name"National Defense Research Institute (U.S.)"
schema:contributor
<http://viaf.org/viaf/262565556>
rdf:typeschema:Organization
schema:name"United States. Department of Defense. Office of the Secretary of Defense."
schema:contributor
schema:contributor
schema:datePublished"1998"
schema:description"This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R&D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R&D funding level for these ships. Appendixes to the report provide supporting data."@en
schema:exampleOfWork<http://worldcat.org/entity/work/id/800055694>
schema:genre"Electronic books."@en
schema:inLanguage"en"
schema:name"The U.S. aircraft carrier industrial base force structure, cost, schedule, and technology issues for CVN 77"@en
schema:name"United States aircraft carrier industrial base"@en
schema:numberOfPages"170"
schema:publisher
schema:url<http://www.rand.org/publications/MR/MR948/>
schema:url
schema:url<http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=47936>
schema:workExample
schema:workExample

Content-negotiable representations

关闭窗口

请登入WorldCat 

没有张号吗?很容易就可以 建立免费的账号.