The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77 線上預覽
關閉線上預覽
正在查...

The U.S. aircraft carrier industrial base : force structure, cost, schedule, and technology issues for CVN 77

作者: J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.); et al
出版商: Santa Monica, CA : Rand, 1998.
版本/格式:   電子書 : 英語所有版本和格式的總覽
資料庫:WorldCat
提要:
This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77  再讀一些...
評定級別:

(尚未評分) 0 附有評論 - 成爲第一個。

主題
更多類似這樣的

 

在線上查詢

與資料的連結

在圖書館查詢

&AllPage.SpinnerRetrieving; 正在查詢有此資料的圖書館...

詳細書目

類型/形式: Electronic books
其他的實體格式: Print version:
U.S. aircraft carrier industrial base.
Santa Monica, CA : Rand, 1998
(DLC) 98006126
(OCoLC)38566261
資料類型: 網際網路資源
文件類型: 網路資源, 電腦資料
所有的作者/貢獻者: J L Birkler; United States. Navy.; United States. Department of Defense. Office of the Secretary of Defense.; National Defense Research Institute (U.S.); et al
ISBN: 0585377383 9780585377384 083302597X 9780833025975
OCLC系統控制編碼: 48138950
注意: "Prepared for the United States Navy, Office of the Secretary of Defense."
"National Defense Research Institute."
"MR-948-NAVY/OSD"--P. [4] of cover.
描述: 1 online resource (xxxi, 170 p.) : ill. (some col.)
其他題名: United States aircraft carrier industrial base
責任: John Birkler ... [et al.].

摘要:

This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R&D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R&D funding level for these ships. Appendixes to the report provide supporting data.

評論

讀者提供的評論
正在擷取GoodReads評論...
正在擷取DOGObooks的評論

標籤

成爲第一個
確認申請

你可能已經申請過這份資料。若還是想申請,請選確認。

連結資料


<http://www.worldcat.org/oclc/48138950>
library:oclcnum"48138950"
library:placeOfPublication
library:placeOfPublication
owl:sameAs<info:oclcnum/48138950>
rdf:typeschema:Book
schema:about
schema:about
schema:about
schema:about
schema:about
<http://id.worldcat.org/fast/1039880>
rdf:typeschema:Intangible
schema:name"Navy-yards and naval stations--Economic aspects."@en
schema:name"Nuclear aircraft carriers--Design and construction"@en
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
schema:about
<http://id.worldcat.org/fast/1035168>
rdf:typeschema:Intangible
schema:name"Navy-yards and naval stations--Economic aspects"@en
schema:about
schema:bookFormatschema:EBook
schema:contributor
<http://viaf.org/viaf/139691881>
rdf:typeschema:Organization
schema:name"National Defense Research Institute (U.S.)"
schema:contributor
<http://viaf.org/viaf/262565556>
rdf:typeschema:Organization
schema:name"United States. Department of Defense. Office of the Secretary of Defense."
schema:contributor
schema:contributor
schema:datePublished"1998"
schema:description"This report documents the methods and findings of RAND research on the adequacy of the defense industrial base to support further construction of aircraft carriers and on the cost, schedule, and technology issues associated with building the next carrier, designated CVN 77. If the current carrier force size of 12 ships is to be maintained and if a decay in the quality of basic capabilities is to be avoided, CVN 77 cannot be started more than a year or so beyond the currently planned date of 2002. The earlier CVN is started, the less it will cost. Increasing the build duration from the planned 6.5 years to 8.5 years will also reduce costs. However, timing should not greatly affect the survival of suppliers of carrier components. The report recommends beginning ship fabrication before 2002 (which could save hundreds of millions of dollars); ordering contractor-furnished equipment in advance of shipyard start (a savings of tens of millions); and investment in R&D directed toward adapting production processes and engineering improvements that could reduce the cost of carrier construction, operation and maintenance, and manning. In fact, the costs involved in building and operating carriers are so huge that the Navy should consider establishing a stable annual R&D funding level for these ships. Appendixes to the report provide supporting data."@en
schema:exampleOfWork<http://worldcat.org/entity/work/id/800055694>
schema:genre"Electronic books."@en
schema:inLanguage"en"
schema:name"The U.S. aircraft carrier industrial base force structure, cost, schedule, and technology issues for CVN 77"@en
schema:name"United States aircraft carrier industrial base"@en
schema:numberOfPages"170"
schema:publisher
schema:url<http://www.rand.org/publications/MR/MR948/>
schema:url
schema:url<http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=47936>
schema:workExample
schema:workExample

Content-negotiable representations

關閉視窗

請登入WorldCat 

没有帳號嗎?你可很容易的 建立免費的帳號.