CMM in practice : processes for executing software projects at Infosys (Book, 2000) [WorldCat.org]
skip to content
CMM in practice : processes for executing software projects at Infosys Preview this item
ClosePreview this item
Checking...

CMM in practice : processes for executing software projects at Infosys

Author: Pankaj Jalote
Publisher: Reading, Mass : Addison-Wesley, 2000.
Series: SEI series in software engineering.
Edition/Format:   Print book : EnglishView all editions and formats
Summary:

Appropriate for process-oriented software engineering courses using the Capability Maturity Model (CMM).

Rating:

(not yet rated) 0 with reviews - Be the first.

Subjects
More like this

Find a copy in the library

&AllPage.SpinnerRetrieving; Finding libraries that hold this item...

Details

Document Type: Book
All Authors / Contributors: Pankaj Jalote
ISBN: 0201616262 9780201616262
OCLC Number: 42038627
Description: xv, 372 pages : illustrations ; 24 cm.
Contents: 1.1 Process-Based Approach for Project Execution 2 --
1.2 Capability Maturity Model for Software 5 --
1.3 Processes at Infosys 15 --
Part I Project Initiation --
2 Proposals and Contracts 37 --
2.1 Customer and Vendor Interaction 38 --
2.2 The Proposal 40 --
2.3 The Contract 42 --
3 Requirements Specification and Management 45 --
3.1 Requirements Analysis and Specification 46 --
3.2 Requirements Change Management 53 --
3.3 Traceability Management 58 --
3.4 Example: The WAR System 62 --
Part II Project Planning --
4 Process Definition and Tailoring 73 --
4.1 Development Process 74 --
4.2 Process Tailoring 85 --
5 Process Database and Process Capability Baseline 97 --
5.1 Software Metrics and Process Management 98 --
5.2 Process Database 103 --
5.3 Process Capability Baseline 110 --
6 Effort Estimation and Scheduling 119 --
6.1 Background 120 --
6.2 Bottom-Up Estimation 124 --
6.3 Top-Down Estimation 134 --
6.4 Scheduling 136 --
7 Quality Planning and Defect Estimation 145 --
7.1 Quality Management 146 --
7.2 Quantitative Quality Management Planning 151 --
8 Risk Management 159 --
8.1 Background 160 --
8.2 Risk Assessment 163 --
8.3 Risk Control 166 --
8.4 Examples 170 --
9 Project Management Plan 175 --
9.1 Project Management Plan 176 --
9.2 Example: Project Plan of WAR 2.0 178 --
10 Configuration Management 195 --
10.1 Configuration Management Concepts 196 --
10.2 Configuration Management Process 200 --
10.3 Document Control 207 --
10.4 Example: Configuration Management Plan of the WAR Project 209 --
Part III Project Execution and Termination --
11 Life Cycle Execution 219 --
11.1 High-Level Design 220 --
11.2 Detailed Design 223 --
11.3 Build 224 --
11.4 System Testing 226 --
11.5 Acceptance and Installation 231 --
12 Peer Review 233 --
12.1 Review Process 235 --
12.2 Data Collection 243 --
12.3 Monitoring and Control 245 --
12.4 Introduction of Reviews and the NAH Syndrome 252 --
13 Project Monitoring and Control 259 --
13.1 Data Collection 260 --
13.2 Project Tracking 271 --
13.3 Quantitative Monitoring and Control 275 --
13.4 Defect Analysis and Prevention 283 --
14 Project Audits 291 --
14.1 Audit Process 294 --
14.2 Audit Analysis 302 --
15 Project Closure 307 --
15.1 Project Closure Analysis 308 --
15.2 Archiving 313 --
15.3 Closure Analysis Report for WAR 2.0 314 --
Appendix A From ISO 9000 to CMM 325 --
Appendix B Managing the Software Process Improvement Project 343.
Series Title: SEI series in software engineering.
Responsibility: Pankaj Jalote.

Reviews

User-contributed reviews
Retrieving GoodReads reviews...
Retrieving DOGObooks reviews...

Tags

Be the first.
Confirm this request

You may have already requested this item. Please select Ok if you would like to proceed with this request anyway.

Close Window

Please sign in to WorldCat 

Don't have an account? You can easily create a free account.